Pre Investment Study on Mini Hydro at Irrigation Canals and Dams

Country: India State: Kerala Capacity: 29MW 
Click to Go back to Main Page Client: Joint UNDP/ESMAP Energy: 114 GWh

Compared to the other three states in the south of India, irrigation dam and canal systems in Kerala are not as extensive. The main prospects for irrigation based mini-hydro development are associated with the numerous diversion weirs and barrages that have been installed for irrigation and water supply purposes. The Kerala State Electricity Board (KSEB) has completed feasibility studies on the most promising prospects, including those associated with the Peechi Irrigation Dam, the Maniyar Barrage of the Pamba Irrigation project, the tailrace of the Kuttiyadi Dam which discharges water into the Peuvannunmuzhy Irrigation Reservoir, and the Mangalam dam.  

SECSD reviewed proposals on the above schemes which would yield about 115 GWh annually. Modifications in the planning were suggested to make the schemes cost effective such as for example the Kutiyadi scheme

MAP OF KERALA WITH PROJECTS

The list of schemes with the capacity fixed by the study are given below.

PROJECT

Q
(m3/s)
H
(m)
P
  (kW)
E
(GWh)
Cost
(MUSD)
Cost/kW
(USD)
EIRR (%)

IRRIGATION DAM BASED SCHEMES

Kuttiyadi PH-1 12 15 2 x 1500 17.1 1.324 441 40.7
Kuttiyadi PH-2 12 7 2 x 650 5.70 0.877 675 40.7
Kuttiyadi PH-3 12 7 2 x 650 5.70 0.888 683 40.7
Mangalam 5 10 1 x 350 1.30 0.351 1002 13.5
Maniyar 22.5 15 6 x 2500 57.1 5.251 350 41.1
Peechi-I (CBU) 10 21 2 x 1500 10.0 0.720 240 41.2
Peechi-II (RBU) 12 30 2 x 2500 17.1 1.905 381 41.2
TOTAL     28,950 114 11.316 391  